Nice shot Crawf!
I notice the perimeter pile wall looks it's already been completed and capped, and I reckon I can spy the work for crane base at the bottom of the photo, at the edge of the fence.
Search found 2078 matches
- Thu Feb 10, 2022 4:40 pm
- Forum: CBD Development
- Topic: [U/C] 145-159 King William Street (GPO) | 61m | 16 Levels | Hotel
- Replies: 438
- Views: 164091
- Mon Feb 07, 2022 2:50 pm
- Forum: CBD Development
- Topic: [COM] The Switch - 203 North Terrace | 119m | 35 levels | Student Accom
- Replies: 647
- Views: 225994
[COM] Re: The Switch - 203 North Terrace | 119m | 35 levels | Student Accom
Ooops, forgot to post these photos almost two weeks ago. (26/1/2022) 203NorthTerrace-January2022-1.jpg 203NorthTerrace-January2022-2.jpg 203NorthTerrace-January2022-3.jpg I wonder why didn't they finish putting the fins on the north side of the building? Look closely (particularly in the last photo...
- Sun Jan 23, 2022 1:46 pm
- Forum: CBD Development
- Topic: [COM] Festival Plaza Tower 1 | 115m | 27 Levels | Office
- Replies: 2083
- Views: 593972
- Wed Jan 19, 2022 3:45 pm
- Forum: CBD Development
- Topic: [CAN] 207 Pulteney Street | 180m | 55 Levels | Mixed Use
- Replies: 474
- Views: 154037
[CAN] Re: 207 Pulteney Street | 180m | 55 Levels | Mixed Use
This is all super exciting, Adelaide has certainly punched through the "Pyramid" low rise skyline once held so tightly by the ACC. The whole height limit piece is super complex, and I'm sure CDJ would know more about it, but items like operational line of sight (OLS) also come into play th...
- Thu Jan 13, 2022 12:42 pm
- Forum: CBD Development
- Topic: Crane Counter: CBD 8 | Metro 8 | Total 16
- Replies: 1956
- Views: 633648
Re: Crane Counter: CBD 8 | Metro 3 | Total 11
Hammerhead by the looks of it too. Not surprising due to the proximity of the flight path Unless my eyes deceived me saw otherwise on 9 News at 6pm. Is it just me or does it look like it's been erected to full height already? It should go higher. At this height the roof won't be any taller than the...
- Wed Jan 12, 2022 4:53 pm
- Forum: CBD Development
- Topic: Crane Counter: CBD 8 | Metro 8 | Total 16
- Replies: 1956
- Views: 633648
Re: Crane Counter: CBD 8 | Metro 3 | Total 11
Hammerhead by the looks of it too. Not surprising due to the proximity of the flight path
- Tue Dec 14, 2021 2:46 pm
- Forum: CBD Development
- Topic: [SWP] Lot 14 (Old RAH Site)
- Replies: 1052
- Views: 339134
[SWP] Re: Lot 14 (Old RAH Site)
It's the single most striking development Adelaide has seen, in my opinion. I'm sure it will be globally recognised for most importantly the 65,000 years of stories and knowledge the centre will share, along with it's incredible design form. I can't wait to see this grow and its built form develop. ...
- Mon Dec 13, 2021 8:34 am
- Forum: CBD Development
- Topic: [COM] The Switch - 203 North Terrace | 119m | 35 levels | Student Accom
- Replies: 647
- Views: 225994
[COM] Re: The Switch - 203 North Terrace | 119m | 35 levels | Student Accom
On the bright side, we actually got the better "switch" https://www.skyscrapercity.com/threads/cbd-to-the-switch-125m-student-resi.2137162/post-176177139 ...and it's not even close Very much so. The Perth example, stained concrete and all is, well, interesting. I'm trying to be polite.
- Fri Nov 19, 2021 11:27 am
- Forum: CBD Development
- Topic: [COM] Festival Plaza Tower 1 | 115m | 27 Levels | Office
- Replies: 2083
- Views: 593972
[COM] Re: Festival Plaza Redevelopment | $800 million
Not having seen the trees in question, could these not be the tree like frames that will form part of the interactive display, and be covered in climbers?
- Fri Oct 29, 2021 8:20 am
- Forum: CBD Development
- Topic: [COM] The Switch - 203 North Terrace | 119m | 35 levels | Student Accom
- Replies: 647
- Views: 225994
- Wed Oct 27, 2021 8:17 am
- Forum: Website Related
- Topic: Testing
- Replies: 7
- Views: 10614
Re: Testing
Hey mate,
Seems as though the breadcrumb navigation is still not working correctly. Nothing below board index isn't showing.
Cheers!
Seems as though the breadcrumb navigation is still not working correctly. Nothing below board index isn't showing.
Cheers!
- Mon Oct 25, 2021 5:07 pm
- Forum: CBD Development
- Topic: [COM] 269 North Terrace | 119m | 36 Levels | Student accommodation
- Replies: 680
- Views: 260483
[COM] Re: 269 North Terrace | 119m | 36 Levels | Student accommodation
The crane is on its way down now.
- Fri Sep 24, 2021 10:03 am
- Forum: CBD Development
- Topic: [COM] SAHMRI Stage 2
- Replies: 358
- Views: 166913
[COM] Re: SAHMRI Stage 2
Looking over EBG's photo in the crane thread, I'd suggest there'll only be on crane here. The boom looks long enough to cover the entire site.
- Tue Sep 07, 2021 9:03 am
- Forum: CBD Development
- Topic: [COM] SAHMRI Stage 2
- Replies: 358
- Views: 166913
[COM] Re: SAHMRI Stage 2
Crane base has been in for months Very slow going 2025 completion date and started early 2020 Sent from my SM-A515F using Tapatalk This has been one of the most complex soil remediation projects since the new RAH, that was always going to take quite some time. Looking at the site now I would sugges...
- Mon Sep 06, 2021 2:43 pm
- Forum: CBD Development
- Topic: [COM] The Switch - 203 North Terrace | 119m | 35 levels | Student Accom
- Replies: 647
- Views: 225994
[COM] Re: 203 North Terrace | 119m | 35 levels | Student Accom
The core slipform is being removed as we speak. This has topped out as suggested by Patrick.