It is shown that way in the August 2013 fly-through:EBG wrote:I am not impressed by the fact that the convention centre just grabbed the inside lane on the south bound side on the Morphett St bridge; as if the traffic is not bad enough already . I am sure this was not in the original plans.
[COM] Adelaide Convention Centre - Stage 3 | $350m
- Xaragmata
- Super Size Scraper Poster!
- Posts: 1613
- Joined: Thu Jul 19, 2007 2:08 pm
- Location: Adelaide / West
- Contact:
[COM] Re: Adelaide Convention Centre | $350m
[COM] Re: Adelaide Convention Centre | $350m
Most of the structure of the old Exhibition Building has now been demolished. The four cores at each corner still remain.
Looks like the works are having serious impacts on the Railway Station - they have buckets everywhere on Platforms 7, 8 and 9 to catch water leaking from above. If that's the case, one would hope that with the platform closures, they actually are spending the time to put in new, or reinforce the existing support columns in the station.
Looks like the works are having serious impacts on the Railway Station - they have buckets everywhere on Platforms 7, 8 and 9 to catch water leaking from above. If that's the case, one would hope that with the platform closures, they actually are spending the time to put in new, or reinforce the existing support columns in the station.
Any views and opinions expressed are of my own, and do not reflect the views or opinions of any organisation of which I have an affiliation with.
[COM] Re: Adelaide Convention Centre | $350m
Only the cores and some structural steel trusses remain. Picture taken today 23 may 2015
- Attachments
-
- 20150523_conven cen 1.jpg (312.15 KiB) Viewed 6889 times
[COM] Re: Adelaide Convention Centre | $350m
On Saturday numerous cranes were removing the last of the brown precast concrete panels. Paulns what is that equipment on the semi trailer parked by the river bank?
- Attachments
-
- 20150613_conven centrre.jpg (315.03 KiB) Viewed 6302 times
[COM] Adelaide Convention Centre | $350m
I'm not 100% sure EBG but it kind of looked like the top part to a crane or some kind of mechanised crane? I'm only guessing. It was branded as Samaras.
Last edited by Paulns on Mon Jun 15, 2015 3:37 pm, edited 1 time in total.
"SA GOING ALL THE WAY".
[COM] Re: Adelaide Convention Centre | $350m
Looks like a large capacity mobile crane, which would back up what was suggested earlier that this building would be built with mobile cranes rather than tower cranes.
- SouthAussie94
- Legendary Member!
- Posts: 506
- Joined: Tue Mar 27, 2012 10:03 pm
- Location: Southern Suburbs
[COM] Re: Adelaide Convention Centre | $350m
Scaffolding has now been installed along Platform 9 of the train station. There was quite a large amount of noise coming from above which could be heard above the noise of the trains.
"All we are is bags of bones pushing against a self imposed tide. Just be content with staying alive"
Views and opinions expressed are my own and don't necessarily reflect the views or opinions of any organisation of which I have an affiliation
Views and opinions expressed are my own and don't necessarily reflect the views or opinions of any organisation of which I have an affiliation
-
- Super Size Scraper Poster!
- Posts: 2436
- Joined: Tue Mar 05, 2013 4:41 pm
- Location: Adelaide CBD, SA
[COM] Re: Adelaide Convention Centre | $350m
It's a great shame that they haven't electrified all metropolitan lines that are serviced by this station, they could have removed the ventilation shafts from the area.
[COM] Re: Adelaide Convention Centre | $350m
The equipment on the low loader semi trailer was part of a large crawler crane which has been erected on the flat site by the river bank. When operating the red and white section is raised beyond horizontal.
- Attachments
-
- 20150620_convention centre.jpg (208.21 KiB) Viewed 5594 times
[COM] Re: Adelaide Convention Centre | $350m
For a mobile crane, it's just as big as a standard crane when erect like it is this morning. Time to bump the crane count up to 7?
Any views and opinions expressed are of my own, and do not reflect the views or opinions of any organisation of which I have an affiliation with.
[COM] Re: Adelaide Convention Centre | $350m
Some new heavy steel work is now being installed for the new building. Picture as at 8/8/2015
- Attachments
-
- 20150808_convention centre 1.jpg (395.44 KiB) Viewed 5016 times
[COM] Re: Adelaide Convention Centre | $350m
More heavy steel work installed this week.
- Attachments
-
- 20150821_conv centre.jpg (298.43 KiB) Viewed 4747 times
[COM] Re: U/C: Adelaide Convention Centre | $350m
That looked so much better than what we got. The thing we have now is f7cking hideous. Why do they always dumb it down?Patrick_27 wrote:I can't seem to find it anywhere, but I recall a render in the early proposal stage of this development that the extensions to the West and East were going to match the main glass building. To be honest, the attached was the best proposal put forward - probably would have cost significantly more.
Who is online