[COM] [The Precinct] Gallery | 22m | 7lvls | Residential
[COM] Re: #U/C: The Precinct - 5 x 62m, 19 lvl Towers
I love this building site! They are installing the steelwork for the lift well and also a dozen or so steel reinforced columns are already in at above street level. The concrete was poured last weekend and there is no messing around on this building. I would expect the crane to be installed this coming weekend or next.
[COM] Re: #U/C: The Precinct - 5 x 62m, 19 lvl Towers
No tower crane as yet but a lot of progress over the last week since the big concrete pour with steel starting to appear above the fence. Pic from this afternoon:
[COM] Re: #U/C: The Precinct - 5 x 62m, 19 lvl Towers
riding around the other day, ive found a spot to take shots of, where they havent put any cladding on the fence. if you go around to Waymouth St and up that laneway near the garage, they have a left a meter wide walkway, where there is just a wire fence so so can see everything in the site. having said that i should get some pics i spose
[COM] Re: #U/C: The Precinct - 5 x 62m, 19 lvl Towers
Correct. With a foundation pour of over 4000m.Professor wrote:The developers say they are starting to build in April.
[COM] Re: #U/C: The Precinct - 5 x 62m, 19 lvl Towers
That will be some raft foundation. How big was the State Bank pour?
I remember that day, the State Bank foundation pour was going on for hours and then a real storm / high winds hit Adelaide in the mid afternoon but they could not stop the work.
PS Who is the builder for the Altitude?
I remember that day, the State Bank foundation pour was going on for hours and then a real storm / high winds hit Adelaide in the mid afternoon but they could not stop the work.
PS Who is the builder for the Altitude?
[COM] Re: #U/C: The Precinct - 5 x 62m, 19 lvl Towers
I am led to believe that Multiplex is one of the contractors for the project.Professor wrote:That will be some raft foundation. How big was the State Bank pour?
I remember that day, the State Bank foundation pour was going on for hours and then a real storm / high winds hit Adelaide in the mid afternoon but they could not stop the work.
PS Who is the builder for the Altitude?
[COM] Re: #U/C: The Precinct - 5 x 62m, 19 lvl Towers
Yes, along with Urban Construct.AG wrote:I am led to believe that Multiplex is one of the contractors for the project.Professor wrote:That will be some raft foundation. How big was the State Bank pour?
I remember that day, the State Bank foundation pour was going on for hours and then a real storm / high winds hit Adelaide in the mid afternoon but they could not stop the work.
PS Who is the builder for the Altitude?
[COM] Re: #U/C: The Precinct - 5 x 62m, 19 lvl Towers
Urban Construct is not a construction company. They are the developer behind the project.Brando wrote:Yes, along with Urban Construct.AG wrote:I am led to believe that Multiplex is one of the contractors for the project.Professor wrote:That will be some raft foundation. How big was the State Bank pour?
I remember that day, the State Bank foundation pour was going on for hours and then a real storm / high winds hit Adelaide in the mid afternoon but they could not stop the work.
PS Who is the builder for the Altitude?
- monotonehell
- VIP Member
- Posts: 5466
- Joined: Fri Feb 01, 2008 12:10 am
- Location: Adelaide, East End.
- Contact:
[COM] Re: #U/C: The Precinct - 5 x 62m, 19 lvl Towers
Whip out the rulers; this thread just went phallic.
Exit on the right in the direction of travel.
[COM] Re: #U/C: The Precinct - 5 x 62m, 19 lvl Towers
monotonehell wrote:Whip out the rulers; this thread just went phallic.
Says he of the iconic erections.
- Maximus
- Legendary Member!
- Posts: 630
- Joined: Wed Feb 20, 2008 12:05 pm
- Location: The Bush Capital (Canberra)
[COM] Re: #U/C: The Precinct - 5 x 62m, 19 lvl Towers
Hey team, my first post...
Back on topic... Just had cause to drive past this site (literally 30 minutes ago) and I thought y'all might like to know that there was some serious concrete being poured. Tonnes of workers around, Morphett St traffic down to one lane, etc, etc.
That's all for now. Looking forward to joining the healthy and intelligent debate I've witnessed since discovering this forum about a month ago.
Back on topic... Just had cause to drive past this site (literally 30 minutes ago) and I thought y'all might like to know that there was some serious concrete being poured. Tonnes of workers around, Morphett St traffic down to one lane, etc, etc.
That's all for now. Looking forward to joining the healthy and intelligent debate I've witnessed since discovering this forum about a month ago.
It's = it is; its = everything else.
You're = you are; your = belongs to.
Than = comparative ("bigger than"); then = next.
You're = you are; your = belongs to.
Than = comparative ("bigger than"); then = next.
[COM] Re: #U/C: The Precinct - 5 x 62m, 19 lvl Towers
On way back home. Looking forward to the crane this weekend and also the progress on this site.
The way baulderstone are working on the building it will be a really fast project, with very efficient site operations, lots of staff on site and setting the pace in Adelaide's construction management at the moment
The way baulderstone are working on the building it will be a really fast project, with very efficient site operations, lots of staff on site and setting the pace in Adelaide's construction management at the moment
[COM] Re: #U/C: The Precinct - 5 x 62m, 19 lvl Towers
I wonder if the crane will still go up this weekend, considering the weather predicted, and the fact it's a long weekend?