Page 6 of 24

[COM] Re: SAHMRI Stage 2

Posted: Sun Sep 01, 2019 10:04 pm
by rev
Image

[COM] Re: SAHMRI Stage 2

Posted: Mon Sep 02, 2019 8:36 am
by baytram366
IMO it would have been really neat if SAHMRI was built as one big massive iconic building instead of 2 smaller buildings. Could have been a really nice landmark.

[COM] Re: SAHMRI Stage 2

Posted: Mon Sep 02, 2019 10:13 am
by Spotto
baytram366 wrote:
Mon Sep 02, 2019 8:36 am
IMO it would have been really neat if SAHMRI was built as one big massive iconic building instead of 2 smaller buildings. Could have been a really nice landmark.
I think it’s less visually imposing to have two separate buildings, plus size-wise it fits better with the surrounding buildings. Also opportunities for different architecture.

[COM] Re: SAHMRI Stage 2

Posted: Fri Sep 06, 2019 8:22 am
by baytram366
Noticed on the train this morning there is a blue shade type screen erected on the northern side of the building and a large skip bin out the front of the former railways control building. I assume internal demolition has started.

[COM] Re: SAHMRI Stage 2

Posted: Fri Sep 06, 2019 9:17 am
by bm7500
It's probably only me, but I always liked the brutalist bunker type design of the control centre, with its angled glass windows.

[COM] Re: SAHMRI Stage 2

Posted: Fri Sep 06, 2019 1:03 pm
by Listy
bm7500 wrote:
Fri Sep 06, 2019 9:17 am
It's probably only me, but I always liked the brutalist bunker type design of the control centre, with its angled glass windows.
as a kid I always liked seeing it - it was about the most futuristic looking building I knew of in Adelaide. The new building looks fantastic, but I will miss the control building a little bit as well.

[COM] Re: SAHMRI Stage 2

Posted: Tue Sep 10, 2019 10:45 am
by Levesque
Work is currently being done on site today, looks like they are doing some removal works first before demolition, I suspect this isn't far off now then?

[COM] Re: SAHMRI Stage 2

Posted: Wed Sep 25, 2019 9:17 am
by bm7500
Demolition of the old railway control centre commenced this morning.

[COM] Re: SAHMRI Stage 2

Posted: Wed Sep 25, 2019 8:23 pm
by Sensation.Al

[COM] Re: SAHMRI Stage 2

Posted: Fri Sep 27, 2019 12:52 pm
by JanaB
I noticed SAPOL was on site this morning at around 9am.

If you look closely you can see the police van in the bottom right hand corner and the SAPOL officer walking with 2 guys in hi-vis near the ute.
IMG_7795.jpg

[COM] Re: SAHMRI Stage 2

Posted: Fri Sep 27, 2019 1:18 pm
by SRW
Is that a crime scene investigation van? Do they look into workplace accidents -- maybe something happened during demo?

[COM] Re: SAHMRI Stage 2

Posted: Fri Sep 27, 2019 1:22 pm
by Norman
Workplace accidents would be assessed by SafeWork SA as far as I know. This must be a different matter

[COM] Re: SAHMRI Stage 2

Posted: Fri Sep 27, 2019 1:50 pm
by JanaB
From what I saw, there was a single officer who walked around the site and looked through some of the stuff in the back of the ute with gloves. He then took a camera out and was taking pictures of gate/entry to the site where the McMahon sign and the witches hats are. I thought maybe the site had been broken in to overnight.

[COM] SAHMRI Stage 2

Posted: Fri Sep 27, 2019 6:54 pm
by ndru_01
JanaB wrote: thought maybe the site had been broken in to overnight.
That's exactly what happened.

[COM] Re: SAHMRI Stage 2

Posted: Sat Oct 05, 2019 9:15 pm
by EBG
The demolition site as at 5/10/2019.