[COM] Edge/Wave | 40m | 11/12lvls | Office/Residential
[COM] Re: #U/C : Edge & Wave (11-19 Gilles St) - 40m
Thanks for the pic Ben. Good to see this one progressing quickly.
It is a shame 400KWS is taking a long time. But they seem to finally be excavating the northern portion 40KWS and there seems to be an increase in workers at the site this week.
I am just glad all of these projects are going ahead. It will be construction and crane central at this end of the CBD soon. Can't wait
It is a shame 400KWS is taking a long time. But they seem to finally be excavating the northern portion 40KWS and there seems to be an increase in workers at the site this week.
I am just glad all of these projects are going ahead. It will be construction and crane central at this end of the CBD soon. Can't wait
[COM] Re: #U/C : Edge & Wave (11-19 Gilles St) - 40m
oh gawd. Why is that pooey building on the left still standing. Flatten it now!
[COM] Re: #U/C : Edge & Wave (11-19 Gilles St) - 40m
New Render of Edge:
King William Street South after Wave, Edge and Hills:
King William Street South after Wave, Edge and Hills:
[COM] Re: #U/C : Edge & Wave (11-19 Gilles St) - 40m
looks fantastic!Ben wrote:New Render of Edge:
King William Street South after Wave, Edge and Hills:
Opportunity is missed by most people because it is dressed in overalls and looks like work.
[COM] Re: #U/C : Edge & Wave (11-19 Gilles St) - 40m
Nice to see some new colours for Edge and Wave.
- skyliner
- Super Size Scraper Poster!
- Posts: 2359
- Joined: Tue Oct 24, 2006 9:16 pm
- Location: fassifern (near Brisbane)
[COM] Re: #U/C : Edge & Wave (11-19 Gilles St) - 40m
Gives a great idea of the final appearance - Will be even better with the proposed? Brecknock and 400KWS - will start to look like a part of the CBD at last.Wayno wrote:looks fantastic!Ben wrote:New Render of Edge:
King William Street South after Wave, Edge and Hills:
ADELAIDE - TOWARDS A GREATER CITY SKYLINE
Jack.
[COM] Re: #U/C : Edge & Wave (11-19 Gilles St) - 40m
At least it's not offensive.Ben wrote:New Render of Edge:
[COM] Re: #U/C : Edge & Wave (11-19 Gilles St) - 40m
Sort of. It'll look like a hanger-on of the CBD until the space between it and Vic Square gets some hi-rises. Still, I'm not complaining, it's a huge improvement.skyliner wrote: Will be even better with the proposed? Brecknock and 400KWS - will start to look like a part of the CBD at last.
cheers,
Rhino
Rhino
- skyliner
- Super Size Scraper Poster!
- Posts: 2359
- Joined: Tue Oct 24, 2006 9:16 pm
- Location: fassifern (near Brisbane)
[COM] Re: #U/C : Edge & Wave (11-19 Gilles St) - 40m
Note I said 'start to' Rhino. Your thoughts are mine too. I want to see those next 2 northern blocks developed as well. Any inside info anyone?
ADELAIDE - TOWARDS A GREATER CITY SKYLINRE
ADELAIDE - TOWARDS A GREATER CITY SKYLINRE
Jack.
[COM] Re: #U/C : Edge & Wave (11-19 Gilles St) - 40m
I looked at the Wave site this morning. There were maybe 15 people working on a clean site, with a mobile crane putting the steel reinforcing down into the holes and a concrete mixer was also at work.
Then I walked to the 400KWS site and had a look. At one end were two guys fiddling around at the northern fire escape formwork. The whole place was awash with mud. At the other end of the site is an inclined access driveway, also full of mud. So full that a concrete pump truck was bogged halfway up and the guy was waiting for a tanother ruck to tow them out.
The comparison between the two constructin sites and methods was pretty striking.
Then I walked to the 400KWS site and had a look. At one end were two guys fiddling around at the northern fire escape formwork. The whole place was awash with mud. At the other end of the site is an inclined access driveway, also full of mud. So full that a concrete pump truck was bogged halfway up and the guy was waiting for a tanother ruck to tow them out.
The comparison between the two constructin sites and methods was pretty striking.
[COM] Re: #Approved: Wave (11-19 Gilles St) - 12 lvls
Will wrote:The developers have lodged an application to make some adjustements to the tower. In essence the changes will involve:
The changes have been categorised as Category 2, and are currently on public notofication.Vary previous authorisation (DA/933/2006) to demolish existing building and construct 12 level office/residential building with ground floor retail tenancy, car parking on levels 1 to 3, offices on levels 4 to 6 and 8 apartments on levels 7 to 12 - Change levels 7 and 8 from apartments to office use, install external horizontal louvre screens from levels 5 to 8, replacement of single apartment on level 9 with two apartments and construction of an additional lift.
These alterations which I reported are coning before the ACC DAP next Monday.
It is expected that the ACC DAP will grant planning APPROVAL to these changes.
[COM] Re: #U/C : Edge & Wave (11-19 Gilles St) - 40m
Changes to Wave were approved last Monday at DAP.
Both Wave and Edge are proceeding with H&Y as Builder as is Hills HQ across the road.
Expected completions are:
Edge August 2009
Wave October 2009
Hills December 2009
In addition Marshall & Brougham are Builders for the CML Hotel where internal demolition is under way with completion as the Rydges CML Hotel due in December 2009.
It should be noted that the Architect and Interior Designer for all of these projects is JPE and remarkably for Adelaide projects of this scale they have not been forced into a joint venture with Interstate Architects. Total value of these 4 projects is around $200M.
Both Wave and Edge are proceeding with H&Y as Builder as is Hills HQ across the road.
Expected completions are:
Edge August 2009
Wave October 2009
Hills December 2009
In addition Marshall & Brougham are Builders for the CML Hotel where internal demolition is under way with completion as the Rydges CML Hotel due in December 2009.
It should be noted that the Architect and Interior Designer for all of these projects is JPE and remarkably for Adelaide projects of this scale they have not been forced into a joint venture with Interstate Architects. Total value of these 4 projects is around $200M.
[COM] Re: #U/C : Edge & Wave (11-19 Gilles St) - 40m
Thanks Joy. Much appreciated.
Do you know when the cranes will go up and how many there will be?
Do you know when the cranes will go up and how many there will be?
- Ho Really
- Super Size Scraper Poster!
- Posts: 2675
- Joined: Sun Aug 27, 2006 3:29 pm
- Location: In your head
[COM] Re: #U/C : Edge & Wave (11-19 Gilles St) - 40m
You've obviously got a good team there at JPE. Good onya.joy wrote:...It should be noted that the Architect and Interior Designer for all of these projects is JPE and remarkably for Adelaide projects of this scale they have not been forced into a joint venture with Interstate Architects. Total value of these 4 projects is around $200M.
Cheers
Confucius say: Dumb man climb tree to get cherry, wise man spread limbs.
[COM] Re: #U/C : Edge & Wave (11-19 Gilles St) - 40m
Looks like JPE will be pretty flat out with contract admin next year.joy wrote:Changes to Wave were approved last Monday at DAP.
Both Wave and Edge are proceeding with H&Y as Builder as is Hills HQ across the road.
Expected completions are:
Edge August 2009
Wave October 2009
Hills December 2009
In addition Marshall & Brougham are Builders for the CML Hotel where internal demolition is under way with completion as the Rydges CML Hotel due in December 2009.
It should be noted that the Architect and Interior Designer for all of these projects is JPE and remarkably for Adelaide projects of this scale they have not been forced into a joint venture with Interstate Architects. Total value of these 4 projects is around $200M.
Who is online