Page 1 of 2

[U/C] 210 Greenhill Road, Eastwood | ~24m | 7 Levels

Posted: Mon Aug 05, 2019 8:53 am
by Ben
Going before DAc this Thursday. Looks to be a headquarters for Bridgestone.

https://www.saplanningcommission.sa.gov ... hments.pdf

Image

[U/C] Re: 210 Greenhill Road, Eastwood | ~24m | 7 Levels

Posted: Mon Aug 05, 2019 6:16 pm
by phenom
Very thankful for the required changes on this one, particularly setbacks (they proposed none!) and the retention of the council trees. Greenhill Road does not need to look industrial. It's not a bad development otherwise.

[U/C] Re: 210 Greenhill Road, Eastwood | ~24m | 7 Levels

Posted: Mon Aug 05, 2019 7:12 pm
by Nathan
5 levels of car parking for 3 levels of office space? :?

(meanwhile, it has less than half the minimum required bicycle spaces – just 12 for the entire building)

[U/C] Re: 210 Greenhill Road, Eastwood | ~24m | 7 Levels

Posted: Fri Aug 09, 2019 2:00 pm
by WGG
The car parking rates were provided in accordance with the minimum and maximum sought by the Development Plan.

The SCAP granted DPC to this at its hearing yesterday.

[U/C] Re: 210 Greenhill Road, Eastwood | ~24m | 7 Levels

Posted: Sat Nov 16, 2019 4:02 pm
by EBG
Demolition in progress even as I post. getting ready to start work on level 8 building. Click on picture for bigger.

[U/C] Re: 210 Greenhill Road, Eastwood | ~24m | 7 Levels

Posted: Sat Nov 23, 2019 10:44 pm
by EBG
One week later and the demolition is nearly complete. At the bottom of the picture is the frame work of the old car park car ports. Note they have saved the trees at the front of the site. Click on picture for bigger.

[U/C] Re: 210 Greenhill Road, Eastwood | ~24m | 7 Levels

Posted: Sat Dec 07, 2019 10:07 pm
by EBG
Not wasting any time on this project, piling has commenced. During the past week a series of piles were bored up against the existing building (Medibank Building) on left hand side of picture. Click on picture for bigger.

[U/C] Re: 210 Greenhill Road, Eastwood | ~24m | 7 Levels

Posted: Sun Feb 02, 2020 5:34 pm
by EBG
2/2/2020 piling has been completed on all side of the site and now a piling cap is been placed around the boundary.
Click on pictures for bigger.

[U/C] Re: 210 Greenhill Road, Eastwood | ~24m | 7 Levels

Posted: Thu Feb 27, 2020 9:44 pm
by EBG
Having set up a piled retaining wall all around the boundary, they are now excavating the basement. I will try to get a picture soon.

[U/C] Re: 210 Greenhill Road, Eastwood | ~24m | 7 Levels

Posted: Sat Feb 29, 2020 8:06 pm
by EBG
29/2/2020 Picture of the excavation of the basement , please click on picture for bigger.

[U/C] Re: 210 Greenhill Road, Eastwood | ~24m | 7 Levels

Posted: Sat Mar 07, 2020 9:23 pm
by EBG
7/3/2020 more excavation during the past week. Note the builders have closed off the side street. Please click on picture for bigger.

[U/C] Re: 210 Greenhill Road, Eastwood | ~24m | 7 Levels

Posted: Sat Mar 21, 2020 8:39 pm
by EBG
Update 22/3/2020 work has started on the basement footings. Please click on picture for bigger.

[U/C] Re: 210 Greenhill Road, Eastwood | ~24m | 7 Levels

Posted: Sun Mar 29, 2020 9:46 pm
by EBG
In the last week they have excavated right up to the existing building on the boundary and installed temporary wall bracing to support the side wall.

[U/C] Re: 210 Greenhill Road, Eastwood | ~24m | 7 Levels

Posted: Sat Apr 18, 2020 9:51 pm
by EBG
This project is making good progress. The basement columns are complete and some concrete precast panels have being installed. Please click on picture for bigger.

[U/C] Re: 210 Greenhill Road, Eastwood | ~24m | 7 Levels

Posted: Sat May 02, 2020 9:14 pm
by EBG
2/5/2020 now starting work on ground floor. Please click on picture for bigger.