[COM] SAHMRI Stage 2

All high-rise, low-rise and street developments in the Adelaide and North Adelaide areas.
Message
Author
User avatar
SRW
Donating Member
Donating Member
Posts: 3543
Joined: Fri Jun 08, 2007 9:42 pm
Location: Glenelg

[COM] Re: SAHMRI Stage 2

#46 Post by SRW » Mon Mar 26, 2018 8:36 pm

Is there a settled design yet?
Keep Adelaide Weird

Listy
High Rise Poster!
Posts: 186
Joined: Sat Oct 01, 2016 11:07 pm

[COM] Re: SAHMRI Stage 2

#47 Post by Listy » Tue Mar 27, 2018 9:57 pm

The fenced area the excavator is tidying up was the site office for AHMS. I think that will become footpath again once it's tidied up. However, there has been a little drilling rig looking thing in the Rail Centre carpark for the last few days - it looks like someone is taking core samples?

Image

Image

Ben
VIP Member
VIP Member
Posts: 7475
Joined: Mon Dec 19, 2005 11:46 am
Location: Adelaide

[COM] Re: SAHMRI Stage 2

#48 Post by Ben » Fri Apr 27, 2018 12:36 pm

Officially lodged now. Sounds like its 12 levels.
Type: Schedule 10
Application Number: S10/23/2018
Lodgement Date: 27/04/2018
Location: Railway & Operations Control/Comm Centre, North Terrace, ADELAIDE SA 5000
Description: Multi-storey health and medical clinical treatment and research centre including proton therapy unit, ground floor lobby, reception and commercial tenancy, 11 levels of clinical trial, dry lab and commercial office floor area.

Spurdo
High Rise Poster!
Posts: 246
Joined: Sun Apr 10, 2016 9:20 pm

[COM] Re: SAHMRI Stage 2

#49 Post by Spurdo » Tue May 08, 2018 4:13 pm

I can tell you now, this one is going to look really good. I have seen some actual renders for this and it looks way better than the one on the website.

Spurdo
High Rise Poster!
Posts: 246
Joined: Sun Apr 10, 2016 9:20 pm

[COM] Re: SAHMRI 2 | Australian Bragg Centre for Proton Therapy | 60m | 18 Levels | Mixed

#50 Post by Spurdo » Mon Jun 18, 2018 10:23 pm

Plans are up for this one. 18 Floors & 60 Metres.

- https://www.saplanningcommission.sa.gov ... HMRI_2.pdf

Alyx
High Rise Poster!
Posts: 266
Joined: Tue Aug 08, 2006 9:49 pm
Location: Adelaide

[COM] Re: SAHMRI Stage 2

#51 Post by Alyx » Mon Jun 18, 2018 10:35 pm

Image

Image

Ben
VIP Member
VIP Member
Posts: 7475
Joined: Mon Dec 19, 2005 11:46 am
Location: Adelaide

[COM] Re: SAHMRI Stage 2

#52 Post by Ben » Fri Jul 06, 2018 4:24 pm

Expected to be approved at Thursday meeting. Construction to start before year end.

https://www.saplanningcommission.sa.gov ... hments.pdf

User avatar
timtam20292
Legendary Member!
Posts: 1384
Joined: Tue Apr 19, 2016 1:03 pm

[COM] Re: SAHMRI Stage 2

#53 Post by timtam20292 » Fri Jul 06, 2018 7:35 pm

Can't wait to watch it grow! Beautiful building. :applause:

Ben
VIP Member
VIP Member
Posts: 7475
Joined: Mon Dec 19, 2005 11:46 am
Location: Adelaide

[COM] Re: SAHMRI Stage 2

#54 Post by Ben » Fri Jul 13, 2018 12:48 pm

Approved yesterday.

BennyLangers
Sen-Rookie-Sational
Posts: 43
Joined: Mon Jan 30, 2017 2:11 pm

[COM] Re: SAHMRI Stage 2

#55 Post by BennyLangers » Mon Jul 16, 2018 1:15 pm


User avatar
duke
High Rise Poster!
Posts: 406
Joined: Wed Aug 02, 2006 7:15 pm

[COM] Re: SAHMRI Stage 2

#56 Post by duke » Mon Jul 16, 2018 7:14 pm

zippySA wrote:
Wed Sep 07, 2016 4:01 pm
I do think Adelaide should be one of those destinations - but for a $200M facility where the proton beam (in a massive bunker under it) will cost probably best part of $100M of that sum, with expected "savings" of $2M per year - doesn't seem the best use of limited funds. I'm trying to say that we should develop it, but target something that will assist much more of the population (I don't know what that it - but am sure there are lots of other areas needing specialist research and treatment) - whilst maintaining sending patients overseas - seems to me to be much better use of resources (ie - how many proton beams does the world truly need??)
The government only pays for about 10 people per year who meet specific criteria including on death's door and most likely to respond to treatment.
Others must pay their own way at $200,000-$300,000 for treatment.
I personally know of people that don't meet the government requirements and can't afford the treatment, so they are having repeated operations removing the growths every few years at great expense to the taxpayer. There are many people around Australia waiting for this machine to become operational so they don't die or have to endure repeated operations.
It will also bring in people from other countries in the Asia Pacific region.
The proton therapy machine is more important and impressive than any construction in Adelaide's recent history.

User avatar
timtam20292
Legendary Member!
Posts: 1384
Joined: Tue Apr 19, 2016 1:03 pm

[COM] Re: SAHMRI Stage 2

#57 Post by timtam20292 » Mon Jul 16, 2018 7:35 pm

I wish it was built now so my brother could receive the treatment. :cry:

User avatar
AndyWelsh
Legendary Member!
Posts: 748
Joined: Tue Dec 19, 2017 11:44 pm

[COM] Re: SAHMRI Stage 2

#58 Post by AndyWelsh » Tue Nov 13, 2018 11:14 pm

Interesting detail on SAHMRI 2 in this Adelaide Metro announcement on late night rail line closures.

https://www.adelaidemetro.com.au/Announ ... rail-lines

“A complete closure of all Adelaide Metro rail lines is planned to occur on Saturday 1 December and Sunday 2 December as part of these essential works. These works are required to make way for construction of the South Australian Health and Medical Research Institute 2 (SAHMRI 2) on North Terrace.”


Sent from my iPhone using Tapatalk

Tommo
Sen-Rookie-Sational
Posts: 14
Joined: Mon May 30, 2011 10:27 am

[COM] Re: SAHMRI Stage 2

#59 Post by Tommo » Fri Nov 16, 2018 1:47 pm

They're moving rail signalling control terminations to the new building under construction on the Northern side of the rail yard as you enter the Adelaide station (via rail), the existing rail control building can then be demolished for construction of SAHMRI 2 :banana:

Prodical
High Rise Poster!
Posts: 474
Joined: Sun May 15, 2016 5:10 pm

[COM] Re: SAHMRI Stage 2

#60 Post by Prodical » Tue Jan 01, 2019 10:43 pm

The existing rail control building looks closed now - hope they demolish it soon and start getting this great looking SAMRI II underway
Attachments
SAMRI 1.JPG
SAMRI 1.JPG (3.3 MiB) Viewed 4964 times

Post Reply

Who is online

Users browsing this forum: Ahrefs [Bot], Algernon, Bing [Bot] and 11 guests