Hey guys... thought i would start a new thread regarding the development on Ifould Street, the pics were taken around the development..
Sorry about the picture quality, the pics were taken on my 2mega pixel mobile phone.
Sorry about the picture quality, the pics were taken on my 2mega pixel mobile phone.
South Australia the Festival State
- skyliner
- Super Size Scraper Poster!
- Posts: 2359
- Joined: Tue Oct 24, 2006 9:16 pm
- Location: fassifern (near Brisbane)
[COM] Re: #U/C Ifould Street
pardon the ignorance- but what height/floor level has ths project to attain? 2ndly, can't place I fould St yet in the CBD. Looks to be of some substance however.
ADELAIDE - TOWARDS A GREATER CITY SKYLINE
ADELAIDE - TOWARDS A GREATER CITY SKYLINE
Jack.
[COM] Re: #U/C Ifould Street
Check here:skyliner wrote:pardon the ignorance- but what height/floor level has ths project to attain? 2ndly, can't place I fould St yet in the CBD. Looks to be of some substance however.
ADELAIDE - TOWARDS A GREATER CITY SKYLINE
http://maps.google.com.au/maps?q=-34.92 ... 01206&z=20
- Xaragmata
- Super Size Scraper Poster!
- Posts: 1613
- Joined: Thu Jul 19, 2007 2:08 pm
- Location: Adelaide / West
- Contact:
[COM] Re: #U/C Ifould Street
This appears to be Aria Terraces, by FormeProjex, advertised as 11 Daly Street (cnr Ifould) as shown in joshzxzx's 3rd pic.
Four levels, 12 apartments - http://www.realestateview.com.au/Real-E ... 411_S.html
Four levels, 12 apartments - http://www.realestateview.com.au/Real-E ... 411_S.html
[COM] Re: #U/C Ifould Street
No, that is a separate project.Xaragmata wrote:This appears to be Aria Terraces, by FormeProjex, advertised as 11 Daly Street (cnr Ifould) as shown in joshzxzx's 3rd pic.
Four levels, 12 apartments - http://www.realestateview.com.au/Real-E ... 411_S.html
The tower crane is for a 8 level building developed by the Department of Familiies and Communities
- Xaragmata
- Super Size Scraper Poster!
- Posts: 1613
- Joined: Thu Jul 19, 2007 2:08 pm
- Location: Adelaide / West
- Contact:
[COM] Re: #U/C Ifould Street
Last edited by Xaragmata on Mon Jun 07, 2010 1:09 pm, edited 1 time in total.
[COM] Re: #U/C Ifould Street
Crane came down on the weekend. God knows how those guys can work at that height!!
- Attachments
-
- IMG_0648.jpg (884.59 KiB) Viewed 4296 times
[COM] Re: #U/C Ifould Street
Crane almost gone on Saturday
- Attachments
-
- IMG_0653.jpg (829.44 KiB) Viewed 4295 times
[COM] Re: #U/C Ifould Street
This is also the new small apartment building on the western side of Daly St, between Wakefield and Ifould
- Attachments
-
- IMG_0650.jpg (1020.66 KiB) Viewed 4294 times
[COM] Re: #U/C Ifould Street
Does anyone have the inside word on what re-working of Ifould St between Pulteney and Frome is about to happen?
Council needs to make the footpaths disable compliant due to this 'non-compliance' having been brought to their attention.
AFAIK there were a couple of options considered, make the street one way to Pulteney, or keep it two way, and lose the parking on one side.
Anybody know if this is right, and if so, which option is happening?
(The LOL attached to this is that just a week ago, the Council re-did all the line marking.... )
Council needs to make the footpaths disable compliant due to this 'non-compliance' having been brought to their attention.
AFAIK there were a couple of options considered, make the street one way to Pulteney, or keep it two way, and lose the parking on one side.
Anybody know if this is right, and if so, which option is happening?
(The LOL attached to this is that just a week ago, the Council re-did all the line marking.... )
[COM] Re: #U/C Ifould Street
The Council were supposed to start in the last two weeks and they appeared to be getting set up. Site shed trailers were delivered and parking on the southern side was changed to permit parking only, but by the end of last week they were gone, possibly due to the fact that the letter they dropped off claimed they were going to finish two weeks before they started. Also, the option they decided on was to keep it two-way and remove half the parking.