Search found 2078 matches
- Mon Aug 30, 2021 9:08 am
- Forum: CBD Development
- Topic: [COM] The Switch - 203 North Terrace | 119m | 35 levels | Student Accom
- Replies: 647
- Views: 225346
[COM] Re: 203 North Terrace | 119m | 35 levels | Student Accom
Could elevation be a factor? Not that there would be much difference. I suspect that 203N is about a metre or two higher than 269N. As from the intersection of Frome and Rundle is pretty downhill from there to the Torrens. I'm pretty sure there's a marked elevation shift between the two locations. ...
- Fri Aug 06, 2021 7:56 am
- Forum: CBD Development
- Topic: [SWP] Lot 14 (Old RAH Site)
- Replies: 1052
- Views: 338060
[SWP] Re: Lot 14 (Old RAH Site)
Absolutely spectacular. I love it. From its form to its interaction with the adjacent botanic gardens. I also really like the naturalisation of the foot path in front.
Phenomenal outcome!
Phenomenal outcome!
- Thu Jul 29, 2021 9:31 pm
- Forum: CBD Development
- Topic: [COM] 269 North Terrace | 119m | 36 Levels | Student accommodation
- Replies: 680
- Views: 259612
[COM] Re: 269 North Terrace | 119m | 36 Levels | Student accommodation
Core slip form is being removed.
- Tue Jul 27, 2021 7:41 pm
- Forum: Website Related
- Topic: Testing
- Replies: 7
- Views: 10581
Re: Testing
Hey Howie, the navigation breadcrumb across the top of the page isn't complete, you can click on the index but not in the current section you're in.
Cheers!
Cheers!
- Tue Jul 13, 2021 9:40 pm
- Forum: CBD Development
- Topic: [COM] 269 North Terrace | 119m | 36 Levels | Student accommodation
- Replies: 680
- Views: 259612
[COM] Re: 269 North Terrace | 119m | 36 Levels | Student accommodation
I dare say this has topped out. All of the signage has been removed from the core slip form, I would expect it to be dismantled soon. The top floor pace may have slowed down in preparation for the mass tuned dampener that will be installed at the top of the building. It topped out about 2 months ag...
- Mon Jul 12, 2021 8:08 am
- Forum: CBD Development
- Topic: [COM] 269 North Terrace | 119m | 36 Levels | Student accommodation
- Replies: 680
- Views: 259612
[COM] Re: 269 North Terrace | 119m | 36 Levels | Student accommodation
I dare say this has topped out. All of the signage has been removed from the core slip form, I would expect it to be dismantled soon.
The top floor pace may have slowed down in preparation for the mass tuned dampener that will be installed at the top of the building.
The top floor pace may have slowed down in preparation for the mass tuned dampener that will be installed at the top of the building.
- Fri Jul 09, 2021 7:54 am
- Forum: CBD Development
- Topic: [COM] Festival Plaza Tower 1 | 115m | 27 Levels | Office
- Replies: 2078
- Views: 591776
[COM] Re: Festival Plaza Redevelopment | $800 million
So we're judging a project prior to it even being completed now? Ok then....
- Wed Jun 30, 2021 3:59 pm
- Forum: CBD Development
- Topic: [COM] The Switch - 203 North Terrace | 119m | 35 levels | Student Accom
- Replies: 647
- Views: 225346
[COM] Re: 203 North Terrace | 119m | 35 levels | Student Accom
Crane rise happened today.
- Thu Jun 17, 2021 9:19 am
- Forum: CBD Development
- Topic: [COM] The Switch - 203 North Terrace | 119m | 35 levels | Student Accom
- Replies: 647
- Views: 225346
[COM] Re: 203 North Terrace | 119m | 35 levels | Student Accom
If you stand on the corner of King William and North Terrace and view the development, you'll see how the design and its emphasis on vertical lines makes sense. Is it the best of most sympathetic approach? Far from it, but when viewed with the other NT fronted buildings, the reoccurring vertical tre...
- Mon Jun 14, 2021 2:26 pm
- Forum: CBD Development
- Topic: [COM] 269 North Terrace | 119m | 36 Levels | Student accommodation
- Replies: 680
- Views: 259612
[COM] Re: 269 North Terrace | 119m | 36 Levels | Student accommodation
Crane has had a decent jump over the weekend, I'd say this is it's last rise.
- Fri Apr 30, 2021 12:13 pm
- Forum: CBD Development
- Topic: [COM] SAHMRI Stage 2
- Replies: 358
- Views: 166521
[COM] Re: SAHMRI Stage 2
I wonder if piling for the core pad is also underway too?
- Tue Apr 27, 2021 8:50 pm
- Forum: CBD Development
- Topic: [COM] 269 North Terrace | 119m | 36 Levels | Student accommodation
- Replies: 680
- Views: 259612
[COM] Re: 269 North Terrace | 118m | 36 Levels | Student accommodation
Great shot!Plasmatron wrote: ↑Tue Apr 27, 2021 7:32 pmView from the medical centre car park in North Adelaide. (27/4/2021)
269NorthTerrace-April2021-1.jpg
From this angle 203 NT will look enormous when finished, almost the tallest on the skyline. It's super thin perspective from this northern angle will accentuate that too.
- Sun Apr 18, 2021 11:17 am
- Forum: CBD Development
- Topic: (VIS) Hungry Jack's Carpark
- Replies: 48
- Views: 11452
Re: (VIS) Hungry Jack's Carpark
This should be considered Adelaide's premier location for development. Using a sympathetic podium, consistent of facades and finishes found along Rundle street, transitioning to a stepped back tower of considerable proportions, which I believe with this site's line of site location with Adelaide Air...
- Wed Apr 14, 2021 4:44 pm
- Forum: CBD Development
- Topic: [COM] 73-85 Pirie Street | 89m | 22 Levels | Office
- Replies: 338
- Views: 153922
- Tue Apr 06, 2021 8:18 am
- Forum: CBD Development
- Topic: [COM] 269 North Terrace | 119m | 36 Levels | Student accommodation
- Replies: 680
- Views: 259612
[COM] Re: 269 North Terrace | 118m | 36 Levels | Student accommodation
Looks like there was a considerable crane jump over the weekend. Don't believe it will be the final one however, I'd say one more for sure.