[U/C] Re: M2 North-South Motorway

Posted: Fri Sep 18, 2020 7:08 pm
by 1NEEDS2POST
Cross streets don't need motorway access if we have a tunnel. All that needs to happen is the occasional connection between the surface st South Rd and the motorway.
AG wrote:
Wed Sep 16, 2020 10:08 am
I can't remember where I saw this, but I have seen some unique grade separation projects which involve putting traffic in one direction through a cut and cover tunnel, and then putting traffic in the opposite direction on an overpass which sits directly on top of and is supported by the tunnel structure, with the ramps to ground level at each end staggered to save ground level space.
We could just have a double decker cut and cover tunnel beneath the existing South Rd. It would easily fit in that land area. The tunnel may have to have bends to fit the staggered ramps.

[U/C] Re: M2 North-South Motorway

Posted: Sat Sep 19, 2020 7:48 am
by ChillyPhilly
Excuse the rushed photo, but the first beams are being assembled at R2P.

Image

[U/C] Re: M2 North-South Motorway

Posted: Sun Sep 20, 2020 7:38 pm
by aceman
is there more layers of bitumen to go down in the trench at Darlington? when you enter the trench at the northern end when travelling south the surface has been scraped and there are large raised sections around the man hole covers of the inspection ports. doesn't look finished at all

[U/C] Re: M2 North-South Motorway

Posted: Sun Sep 20, 2020 7:56 pm
by NYG
aceman wrote:is there more layers of bitumen to go down in the trench at Darlington? when you enter the trench at the northern end when travelling south the surface has been scraped and there are large raised sections around the man hole covers of the inspection ports. doesn't look finished at all
Can’t remember where but recently read that lowered motorway is getting final surfacing done towards the end of the year.

[U/C] Re: M2 North-South Motorway

Posted: Sun Sep 20, 2020 9:41 pm
by Spotto
NYG wrote:
Sun Sep 20, 2020 7:56 pm
aceman wrote:is there more layers of bitumen to go down in the trench at Darlington? when you enter the trench at the northern end when travelling south the surface has been scraped and there are large raised sections around the man hole covers of the inspection ports. doesn't look finished at all
Can’t remember where but recently read that lowered motorway is getting final surfacing done towards the end of the year.
The trench was fully opened on August 1st, I'd love to know what's taking them so long to do final surfacing.

Hopefully they'll also resurface other parts of South Road, the Daws Road to Darlington section in particular is absolutely terrible. T2D is not due to start construction for another four years, the current surfacing on South Road will not last that long.

[U/C] Re: M2 North-South Motorway

Posted: Mon Sep 21, 2020 6:21 am
by rogue
The final layer will be SMA type asphalt and requires warmer temperatures to place.
Expect some action on this next month.

[U/C] Re: M2 North-South Motorway

Posted: Thu Sep 24, 2020 5:02 pm
by Bacon
Can anyone explain the reasoning behind this?
0E9D24FD-F3EA-4281-9DB5-3858526C4746.jpeg

[U/C] Re: M2 North-South Motorway

Posted: Thu Sep 24, 2020 5:46 pm
by rev
Bacon wrote:
Thu Sep 24, 2020 5:02 pm
Can anyone explain the reasoning behind this?
0E9D24FD-F3EA-4281-9DB5-3858526C4746.jpeg
did you get permission to take that photo? :lol:

Probably just for within the work site it self, might be safety related.
They cant stop you taking a photo or video from the road or footpaths.

[U/C] Re: M2 North-South Motorway

Posted: Thu Sep 24, 2020 5:50 pm
by ChillyPhilly
I'm gonna guess it's because they have a contracted drone operator filming the project.

[U/C] Re: M2 North-South Motorway

Posted: Thu Sep 24, 2020 10:43 pm
by Norman
The workers probably don't want to get photographed, which is fair enough...

[U/C] Re: M2 North-South Motorway

Posted: Fri Sep 25, 2020 11:17 am
by SouthAussie94
It's quite common on construction sites for photography to be forbidden. If for example hardhats are mandatory, yet I take a photo and someone isn't wearing one, and then something happens, it's possible my photo could be used as evidence for any potential follow up. Easier to have a blanket ban than to police the content of photos taken on site.

[U/C] Re: M2 North-South Motorway

Posted: Sun Sep 27, 2020 8:07 am
by Norman
The new drive-through video of the Regency to Pym project is up now. As always, feedback is welcome!

https://youtu.be/TcyIHxtngB4

[U/C] Re: M2 North-South Motorway

Posted: Sun Sep 27, 2020 4:31 pm
by Furyan
ChillyPhilly wrote:
Thu Sep 24, 2020 5:50 pm
I'm gonna guess it's because they have a contracted drone operator filming the project.
More regular drone flights would be something people would be interested in.

[U/C] Re: M2 North-South Motorway

Posted: Sun Sep 27, 2020 7:42 pm
by rev
Norman wrote:
Sun Sep 27, 2020 8:07 am
The new drive-through video of the Regency to Pym project is up now. As always, feedback is welcome!

https://youtu.be/TcyIHxtngB4
Cant remember if I suggested this from one of your previous videos, but perhaps slow the footage down on key areas like the bridge construction.
But other then that :applause:

[U/C] Re: M2 North-South Motorway

Posted: Sun Sep 27, 2020 11:53 pm
by EBG
27/9/2020 Some pictures of the Regency Rd bridge under construction at temporary site. Please click on pictures for bigger.