It took 17 years getting it going both directions at the same time ... Let's not be fussy. Having lived down that way for 30 odd years an off north on south isn't needed or justifiable at this stage or foreseeable futureRene wrote:The entry/exit at Panalatinga/South Rd intersection needs more work as there's no exit (shown on plans) there for those travelling north on the expressway. Even southbound appears restricted with possibly no left turn into South Road.
[COM] Southern Expressway Duplication | $445m | 22km
-
- Sen-Rookie-Sational
- Posts: 30
- Joined: Fri Apr 25, 2014 4:29 pm
- Location: Adelaide, South Australia
- Contact:
[COM] Re: U/C: Southern Expressway Duplication | $445m | 22km
Using Tapatalk
-
- Legendary Member!
- Posts: 522
- Joined: Sun Aug 26, 2012 10:54 am
- Location: Morphett Vale
[COM] Re: U/C: Southern Expressway Duplication | $445m | 22km
The expressway is now open, I was lined up at Old Noarlunga but couldn't see anything at the entrance, I'm guessing the ribbon cutting was at 3 (with 7 news crews attending) and traffic started moving onto the roadway just before 3:15.
Northbound speed limit was 80k the entire way except for the hill at Darlington, which was 60.
Southbound was 100 the whole way, lowering to 80 at the interchanges.
Every bridge over the expressway had quite a few people watching and waving, taking photos, as well as a family with picnic chairs sitting on the mound parallel the expressway near Honeypot Road.
When getting off at Darlington, about half the cars in my group (myself included) did a u-turn at the median and went straight back on the expressway.
Northbound speed limit was 80k the entire way except for the hill at Darlington, which was 60.
Southbound was 100 the whole way, lowering to 80 at the interchanges.
Every bridge over the expressway had quite a few people watching and waving, taking photos, as well as a family with picnic chairs sitting on the mound parallel the expressway near Honeypot Road.
When getting off at Darlington, about half the cars in my group (myself included) did a u-turn at the median and went straight back on the expressway.
Looking forward to a free-flowing Adelaide!
- monotonehell
- VIP Member
- Posts: 5466
- Joined: Fri Feb 01, 2008 12:10 am
- Location: Adelaide, East End.
- Contact:
[COM] Re: U/C: Southern Expressway Duplication | $445m | 22km
INDUCED DEMAND!neoballmon wrote:...When getting off at Darlington, about half the cars in my group (myself included) did a u-turn at the median and went straight back on the expressway.
Exit on the right in the direction of travel.
[COM] Re: U/C: Southern Expressway Duplication | $445m | 22km
Drove it northbound yesterday afternoon (not by plan, just happened to be at Sellicks for lunch). Was pleasantly surprised to see 100 km/h for most of the way. Also drove it southbound to work this morning. Takes me 7 minutes less to get to work from Torrensville to Christies Beach as opposed to taking tapley's hill, brighton rd and lonsdale hwy.
quite chuffed.
quite chuffed.
-
- Super Size Scraper Poster!
- Posts: 2136
- Joined: Fri Dec 08, 2006 3:10 am
- Location: Christies Beach
[COM] U/C: Southern Expressway Duplication | $445m | 22km
Drove southbound on the Darlington to Sherriffs Road section yesterday, and was surprised to see the car that got off in front of me turn and head back along it northbound!
Did the Sherriffs Road to Beach Road section today (both ways). There seems to be quite a lot of work still needed at the junctions, where the speed limit is down to 40.
Did the Sherriffs Road to Beach Road section today (both ways). There seems to be quite a lot of work still needed at the junctions, where the speed limit is down to 40.
Just build it wrote:Bye Union Hall. I'll see you in another life, when we are both cats.
[COM] Re: U/C: Southern Expressway Duplication | $445m | 22km
its pretty amazing that we now have three legitimate motorways in Adelaide.
-
- Super Size Scraper Poster!
- Posts: 2136
- Joined: Fri Dec 08, 2006 3:10 am
- Location: Christies Beach
[COM] Re: U/C: Southern Expressway Duplication | $445m | 22km
Four. But hardly amazing.spiller wrote:its pretty amazing that we now have three legitimate motorways in Adelaide.
Just build it wrote:Bye Union Hall. I'll see you in another life, when we are both cats.
[COM] Re: U/C: Southern Expressway Duplication | $445m | 22km
Isn't it 5? (Southern Expressway; South-eastern Freeway; Port River Expressway; Northern Expressway; North-South Motorway)Aidan wrote:Four. But hardly amazing.spiller wrote:its pretty amazing that we now have three legitimate motorways in Adelaide.
[COM] Re: U/C: Southern Expressway Duplication | $445m | 22km
PRExy doesn't have a Motorway designation.Will wrote:Isn't it 5? (Southern Expressway; South-eastern Freeway; Port River Expressway; Northern Expressway; North-South Motorway)Aidan wrote:Four. But hardly amazing.spiller wrote:its pretty amazing that we now have three legitimate motorways in Adelaide.
Code: Select all
Signature removed
[COM] Re: U/C: Southern Expressway Duplication | $445m | 22km
Not sure why PRExy has an expressway tag when it has an at grade intersection and opening bridge, but that's another story.
- ChillyPhilly
- Super Size Scraper Poster!
- Posts: 2742
- Joined: Sun Dec 07, 2008 11:35 pm
- Location: Kaurna Land.
- Contact:
[COM] Re: U/C: Southern Expressway Duplication | $445m | 22km
Do find that a little odd. Although it is freeway standard east of Eastern Parade.Brucetiki wrote:Not sure why PRExy has an expressway tag when it has an at grade intersection and opening bridge, but that's another story.
Our state, our city, our future.
All views expressed on this forum are my own.
All views expressed on this forum are my own.
[COM] Re: U/C: Southern Expressway Duplication | $445m | 22km
Prexy has an A9 designation.
SE Freeway has the M1 designation and the Northern, Southern and North - South Motorways all share the M2 tag.
SE Freeway has the M1 designation and the Northern, Southern and North - South Motorways all share the M2 tag.
Any views and opinions expressed are of my own, and do not reflect the views or opinions of any organisation of which I have an affiliation with.
[COM] Re: U/C: Southern Expressway Duplication | $445m | 22km
NExy is M20
Code: Select all
Signature removed
-
- Super Size Scraper Poster!
- Posts: 2136
- Joined: Fri Dec 08, 2006 3:10 am
- Location: Christies Beach
[COM] Re: U/C: Southern Expressway Duplication | $445m | 22km
No it doesn't, as it ends at the at grade intersection before the opening bridge.Brucetiki wrote:Not sure why PRExy has an expressway tag when it has an at grade intersection and opening bridge, but that's another story.
The SEXY also ends at at grade intersections, at both ends.
* A few years ago someone asked whether SEXY was the appropriate abbreviation. My response was not until it goes both ways!
Just build it wrote:Bye Union Hall. I'll see you in another life, when we are both cats.
[COM] Re: U/C: Southern Expressway Duplication | $445m | 22km
Ok technically there are more than three but if we're counting roads that originate and terminate with a considerable length in between, its three. I dont count the north south motorway. 3kms is a joke.
maybe by 2100 we'll have upwards of 10 when they do the ring-route. at this stage i doubt south road will be a non-stopper before 2050
maybe by 2100 we'll have upwards of 10 when they do the ring-route. at this stage i doubt south road will be a non-stopper before 2050