[COM] South Road Superway | $842m | 3km
[COM] Re: South Road Upgrade
This project has gone by a lot quicker than I initially thought. Any clue as to when the western deviation will open?
- Xaragmata
- Super Size Scraper Poster!
- Posts: 1613
- Joined: Thu Jul 19, 2007 2:08 pm
- Location: Adelaide / West
- Contact:
[COM] Re: South Road Upgrade
By end of July, as far as I can tell, to allow commencement of Stage 2, which includes the remaining section of bridge deck.Shuz wrote:This project has gone by a lot quicker than I initially thought. Any clue as to when the western deviation will open?
- Xaragmata
- Super Size Scraper Poster!
- Posts: 1613
- Joined: Thu Jul 19, 2007 2:08 pm
- Location: Adelaide / West
- Contact:
[COM] Re: South Road Upgrade
Western deviation is kerbed & partially paved north of Anzac Highway, and reinforcing for bridge deck is largely complete.
Some pics from yesterday - http://www.xaragmata.thebbs.org/album/c ... 8my01.html
Some pics from yesterday - http://www.xaragmata.thebbs.org/album/c ... 8my01.html
[COM] Re: South Road Upgrade
Are those large water tanks going to be part of the overpass structure? sustainability perhaps?Xaragmata wrote:Western deviation is kerbed & partially paved north of Anzac Highway, and reinforcing for bridge deck is largely complete.
Some pics from yesterday - http://www.xaragmata.thebbs.org/album/c ... 8my01.html
Opportunity is missed by most people because it is dressed in overalls and looks like work.
- Xaragmata
- Super Size Scraper Poster!
- Posts: 1613
- Joined: Thu Jul 19, 2007 2:08 pm
- Location: Adelaide / West
- Contact:
[COM] Re: South Road Upgrade
The Project Manager was on 891 radio before 5pm saying that the storm water connection from east to west side of South RdWayno wrote:Are those large water tanks going to be part of the overpass structure? sustainability perhaps?Xaragmata wrote:Western deviation is kerbed & partially paved north of Anzac Highway, and reinforcing for bridge deck is largely complete.
Some pics from yesterday - http://www.xaragmata.thebbs.org/album/c ... 8my01.html
will be done this weekend, so the tanks & pump might be associated with that, if it happens to rain. They don't look permanent.
[COM] Re: South Road Upgrade
Thanks mate. You always seem to go there before I want to (I wanted to go on Monday)Xaragmata wrote:Western deviation is kerbed & partially paved north of Anzac Highway, and reinforcing for bridge deck is largely complete.
Some pics from yesterday - http://www.xaragmata.thebbs.org/album/c ... 8my01.html

[COM] Re: South Road Upgrade
Just thought I'd give you guys a headsup on the South Road project.
As a nearby resident of the tram overpass project, I responded with some feedback one of my concerns being the future provision for space when widening and/or upgrading South Road into a non-stop route in the future (as the plans had failed to indicate otherwise). My question (partially forgotten, was directed at how details of this project failed to coincide with the details of the South Road project in its entirety.
Key notes:
As a nearby resident of the tram overpass project, I responded with some feedback one of my concerns being the future provision for space when widening and/or upgrading South Road into a non-stop route in the future (as the plans had failed to indicate otherwise). My question (partially forgotten, was directed at how details of this project failed to coincide with the details of the South Road project in its entirety.
Key notes:
- South Road tunnel under Port and Grange Roads appears scrapped?
Tram overpass will accomodate a wider South Road = meaning further property acquisition in future.
$70m into planning for a non-stop corridor = I think part of this planning is evident? Because new developments along the road are setback quite some distance from the road.
Rudd commited $500m to 2014 for project.
In conjunction with the release of the ‘Strategic Infrastructure Plan for South Australia’ in 2005, the Rann Government announced its intention to create a non-stop North-South corridor between the Southern Expressway and the Port River Expressway. We have committed hundreds of millions for major projects along South Road, including an underpass at Anzac Highway, the Glenelg Tram Overpass project and an underpass at Sturt Road. The Federal Rudd Labor Government has recognised the importance of a North-South Road corridor to South Australia andhas committed $500 million through Auslink to partner the State Government on this corridor.
The Federal government’s $500 million will be provided between now and 2014, and will be used to remove key bottlenecks along the corridor.
$70 million has been committed to planning for a corridor all the way from the Southern Expressway to the Port River Expressway. The study will be the first step in making the project a reality, and include geotechnical investigations, community consultation, environmental assessments, traffic modelling and detailed cost estimates. At this point in time the nature and timing of potential improvements to the section of South Road in the vicinity of the tram overpass to provide the non-stop flow are yet to be determined however the tram overpass structure will be able to accommodate a wider South Road.
- Xaragmata
- Super Size Scraper Poster!
- Posts: 1613
- Joined: Thu Jul 19, 2007 2:08 pm
- Location: Adelaide / West
- Contact:
[COM] Re: South Road Upgrade
[/quote]Shuz wrote:Just thought I'd give you guys a headsup on the South Road project.
Key notes:
- South Road tunnel under Port and Grange Roads appears scrapped?
Tram overpass will accomodate a wider South Road = meaning further property acquisition in future.
Thanks for the update, Shuz. I was on Port Rd yesterday, & the site of the demolished Pizza Hut on SW side of South Rd is on
the market (apparently not required for underpass). Shops / homes on SE side on Port Rd might be demolished, as one has a
"Save My Home" banner on it. They may be intending to slew the tunnel (if built) to the east to avoid the ETSA substation, but'
they still will need to u/g the high voltage lines between Port & Torrens rds.
[COM] Re: South Road Upgrade
I guess that means we'll have to trual though tonight's Federal Budget release for details!
- Xaragmata
- Super Size Scraper Poster!
- Posts: 1613
- Joined: Thu Jul 19, 2007 2:08 pm
- Location: Adelaide / West
- Contact:
[COM] Re: South Road Upgrade
Some more pics of north-bound onramp (Anzac Hwy to South Rd) and bridgework from Saturday:
http://www.xaragmata.thebbs.org/album/c ... index.html
Adjacent Tennyson Medical Centre:
http://www.xaragmata.thebbs.org/album/a ... 17my1.html
http://www.xaragmata.thebbs.org/album/c ... index.html
Adjacent Tennyson Medical Centre:
http://www.xaragmata.thebbs.org/album/a ... 17my1.html
[COM] Re: South Road Upgrade
The southern side of the bridge overpass has now been concreted, and is almost ready for use.
- Xaragmata
- Super Size Scraper Poster!
- Posts: 1613
- Joined: Thu Jul 19, 2007 2:08 pm
- Location: Adelaide / West
- Contact:
[COM] Re: South Road Upgrade
Thanks, Norman. I'll check it out, now my head cold is gone.Norman wrote:The southern side of the bridge overpass has now been concreted, and is almost ready for use.
[COM] Re: South Road Upgrade
Some are not the best quality, and I apologise for that.
Concrete Bridge Decking






Indented Bus Stop 5A

North-Bound On-Ramp

Underpass Separation Wall



Southern Construction Zone


Black Forest Baptist Church Notice

Concrete Bridge Decking
Indented Bus Stop 5A
North-Bound On-Ramp
Underpass Separation Wall
Southern Construction Zone
Black Forest Baptist Church Notice
- Xaragmata
- Super Size Scraper Poster!
- Posts: 1613
- Joined: Thu Jul 19, 2007 2:08 pm
- Location: Adelaide / West
- Contact:
[COM] Re: South Road Upgrade
Thanks Norman, you have captured it very well! The Big Dig will start in earnest in a few weeks.Norman wrote:No need, I already have, pics coming later.
Who is online
Users browsing this forum: No registered users and 2 guests