#646 Post by muzzamo » Mon Nov 10, 2008 9:50 am

Do you think that this underpass would be wide enough to squeeze in 6 lanes in the future? It looks like it could almost fit that many in.

I'm stoked that the top deck is open now because it means two turning lanes when turning left from anzac highway onto south road again, having 1 turning lane has been a nightmare in peak hour.

User avatar
Norman
Donating Member
Donating Member
Posts: 6523
Joined: Sun Mar 25, 2007 1:06 pm

[COM] Re: South Road Upgrade

#647 Post by Norman » Mon Nov 10, 2008 10:56 am

The extra space is there for wide bike lanes.

User avatar
Xaragmata
Super Size Scraper Poster!
Posts: 1613
Joined: Thu Jul 19, 2007 2:08 pm
Location: Adelaide / West
Contact:

[COM] Re: South Road Upgrade

#648 Post by Xaragmata » Mon Nov 10, 2008 12:45 pm

Norman wrote:The extra space is there for wide bike lanes.
I have read that additional lanes can be added "later" - beams are similar length to Bakewell U/P, which is 3 + 2 lanes
with the shared high level footpath / bike path, & 2 x 1.8 metre commuter bike paths.

Nice collection, Norman, & there are some more of beam installing on Engineering Surveys P/L site of this & other
projects ... http://www.engsurveys.com.au/gallery.php?id=17 (South Road U/P)

http://www.engsurveys.com.au/gallery.php [Gallery main page]

User avatar
Wayno
VIP Member
VIP Member
Posts: 5138
Joined: Mon Dec 17, 2007 2:18 pm
Location: Torrens Park

[COM] Re: South Road Upgrade

#649 Post by Wayno » Mon Nov 10, 2008 1:32 pm

have traffic flow rates through the intersection returned to pre-construction levels?
Opportunity is missed by most people because it is dressed in overalls and looks like work.

drwaddles
High Rise Poster!
Posts: 144
Joined: Thu Aug 21, 2008 12:12 pm
Location: EAS Bay 1

[COM] Re: South Road Upgrade

#650 Post by drwaddles » Mon Nov 10, 2008 1:48 pm

Norman wrote:A few pics from today :)
Love them, as usual, thanks Norman.

User avatar
AtD
VIP Member
VIP Member
Posts: 4579
Joined: Wed Jul 20, 2005 7:00 pm
Location: Sydney

[COM] Re: South Road Upgrade

#651 Post by AtD » Mon Nov 10, 2008 5:37 pm

Shuz wrote:Cheers for the pics Norm, although one must surely question time and time again - why is it not a 3x3 underpass. If we get any funding at all for a north-south corridor, we'll have to go through the whole construction process again just to expand the underpass which seems like a bloody ridiculous waste of time and inconvience for all.
I would not be surprised if the north-south corridor is 4 lanes anyway.

User avatar
AtD
VIP Member
VIP Member
Posts: 4579
Joined: Wed Jul 20, 2005 7:00 pm
Location: Sydney

[COM] Re: South Road Upgrade

#652 Post by AtD » Fri Nov 14, 2008 5:00 pm

The last few pages of not-quite on topic, but otherwise interesting and relevant posts have been moved to a new thread.
http://www.sensational-adelaide.com/for ... f=9&t=2098

Cheers.

JamesXander
High Rise Poster!
Posts: 487
Joined: Mon Oct 22, 2007 8:07 pm

[COM] Re: South Road Upgrade

#653 Post by JamesXander » Fri Nov 14, 2008 7:23 pm

I've always wondered why construction projects cost so much.


This is a broad comment, not just towards this bridge.


But lately I have been working on construction sites, and you begin to realise how little work actually gets done. There is so much fuss about union shit its ridiculous. You have to get Green Cards, J cards, White Cards. Tickets. Its balls.


Then most of the workers do fark all. They just sit about, talk (mainly about how much they are gonna get paid). Then they work, then smoko.


I know some tradies may try hard. But they get paid good wages, and they are slack. Times that good wage by the huge amount of workers the construction company employs. Its incredible. Then that construction company itself takes a slice of the pie.



I don't know how its ever going to change though. The cost of these projects, and constructions in general are ridiculous.

User avatar
AG
VIP Member
VIP Member
Posts: 2111
Joined: Thu Jul 21, 2005 9:44 am
Location: Adelaide SA

[COM] Re: South Road Upgrade

#654 Post by AG » Fri Nov 14, 2008 9:33 pm

JamesXander wrote:I've always wondered why construction projects cost so much.

...

I know some tradies may try hard. But they get paid good wages, and they are slack. Times that good wage by the huge amount of workers the construction company employs. Its incredible. Then that construction company itself takes a slice of the pie.

I don't know how its ever going to change though. The cost of these projects, and constructions in general are ridiculous.
On construction projects, the amount the contractor earns from their role in constructing the project is determined by how quickly and how effectively they construct what is planned. The amount that the contractor gets paid from a construction job is determined from what is agreed to in the contract with the principal (the one who the work is being done for), not from the amount of time the contractor decides to spend constructing the project. If it did run into delays without agreed Extensions of Time, then the contractor would be paying financial penalties. If the client had little idea as to how much they would have to spend on construction then it would become a more financially risky process than it currently is and you'd scare off quite a few clients.

Aidan
Super Size Scraper Poster!
Posts: 2148
Joined: Fri Dec 08, 2006 3:10 am
Location: Christies Beach

[COM] Re: South Road Upgrade

#655 Post by Aidan » Sun Nov 23, 2008 11:40 pm

Shuz wrote:Cheers for the pics Norm, although one must surely question time and time again - why is it not a 3x3 underpass. If we get any funding at all for a north-south corridor, we'll have to go through the whole construction process again just to expand the underpass which seems like a bloody ridiculous waste of time and inconvience for all.
I'm not aware of any 3x3 underpasses anywhere!

But assuming you mean a 3+3 underpass, my original answer stands: even if South Road is upgraded to 3+3, a 2+2 underpass is sufficient. There's enough Anzac Highway traffic to justify one of the lanes each way going up to join it, and traffic would probably flow more smoothly if it did.
Just build it wrote:Bye Union Hall. I'll see you in another life, when we are both cats.

muzzamo
Legendary Member!
Posts: 1030
Joined: Tue Aug 21, 2007 4:44 pm

[COM] Re: South Road Upgrade

#656 Post by muzzamo » Wed Nov 26, 2008 7:03 pm

latest community update newsletter attached.
Attachments
AdelaideConnect Community Update Dec 08.pdf
(646.01 KiB) Downloaded 345 times

RiseHigh
High Rise Poster!
Posts: 103
Joined: Wed Apr 23, 2008 6:41 pm

[COM] Re: South Road Upgrade

#657 Post by RiseHigh » Thu Nov 27, 2008 5:26 pm

JamesXander wrote:I've always wondered why construction projects cost so much.


This is a broad comment, not just towards this bridge.


But lately I have been working on construction sites, and you begin to realise how little work actually gets done. There is so much fuss about union shit its ridiculous. You have to get Green Cards, J cards, White Cards. Tickets. Its balls.


Then most of the workers do fark all. They just sit about, talk (mainly about how much they are gonna get paid). Then they work, then smoko.


I know some tradies may try hard. But they get paid good wages, and they are slack. Times that good wage by the huge amount of workers the construction company employs. Its incredible. Then that construction company itself takes a slice of the pie.



I don't know how its ever going to change though. The cost of these projects, and constructions in general are ridiculous.

What a load of CRAP you dont know what you are talking about do you james. Green cards are getting fazed out into white cards and is all about safety so the workers can go home alive every night and has nothing to do with the union, The union has no power anymore so you hardly ever see them on site. What are you talking about when you say that the workers are all slack , if your slack the boss will sack you because there is no job security at all the union cant do anything. The pay is also crap why do you think there is such a skill shortage because no kids want to work hard for fuckall pay do they. So i would like to know what site you think you work at.

JamesXander
High Rise Poster!
Posts: 487
Joined: Mon Oct 22, 2007 8:07 pm

[COM] Re: South Road Upgrade

#658 Post by JamesXander » Mon Dec 01, 2008 9:01 pm

Everyone I have talked to have said the whitecard is a load of shit. Apparently the final test they ask 'What would you wear to work, shoes, thongs or steel cap boots'.


I am allowed onto a construction site because I have a peice of paper stating I intend to get a white card. See its a load of shit.



Slack workers are everywhere, its a common consensus. I guess a streotype. Generally the workers I have seen, and I have seen a few do not put in alot of effort.

And please don't tell me kids dont want to go into the construction industry because of the pay. Its the perception of the industry that is the problem. People want to go to university becasue they think it will lead them to a better life and a better social standing.

Construction workers can earn much more then alot of University Qualified professions, which is in its own right a load of shit.


But as you said their is a skills shortage, so why would a boss fire a worker. And what incentive does a worker have to work his arse off?

User avatar
rhino
Super Size Scraper Poster!
Posts: 3106
Joined: Thu Sep 29, 2005 4:37 pm
Location: Nairne

[COM] Re: South Road Upgrade

#659 Post by rhino » Tue Dec 02, 2008 10:32 am

JamesXander wrote: Construction workers can earn much more then alot of University Qualified professions, which is in its own right a load of shit.
You don't need a university degree to be a rigger (crane controller), but you are accepting a frigging lot of responsibility and should be (and are) paid accordingly. A university degree means jack shit unless you are willing to take responsibility for the outcomes of your work. Don't give that degree so much credence, there are a lot of people out there with degrees who just don't have a clue.
cheers,
Rhino

muzzamo
Legendary Member!
Posts: 1030
Joined: Tue Aug 21, 2007 4:44 pm

[COM] Re: South Road Upgrade

#660 Post by muzzamo » Tue Dec 02, 2008 12:57 pm

Just open the immigration floodgates for construction workers/trades.. thats what they have done in IT. Will solve any "slackness" problems.