[U/C] Ovingham Level Crossing Removal | $231m

Threads relating to transport, water, etc. within the CBD and Metropolitan area.
Message
Author
User avatar
ChillyPhilly
Super Size Scraper Poster!
Posts: 2582
Joined: Sun Dec 07, 2008 11:35 pm
Location: Kaurna Land.
Contact:

[U/C] Re: Ovingham Level Crossing Removal | $231m

#181 Post by ChillyPhilly » Tue Dec 21, 2021 11:42 am

Is the rail line going to be recessed slightly? That might help, but might be tricky now that gantries and wiring have been installed.
Our state, our city, our future.

All views expressed on this forum are my own.

Nort
Super Size Scraper Poster!
Posts: 2153
Joined: Tue Feb 09, 2010 2:08 pm

[U/C] Re: Ovingham Level Crossing Removal | $231m

#182 Post by Nort » Tue Dec 21, 2021 12:39 pm

marbles wrote:
Sun Dec 19, 2021 11:59 am
that bridge dont look too high, look at the height of the truck to the bridge. gotta get trains under there

but yes probs just the camera angle

so the obvious reply is..."yea just the camera angle"
Can see that the electrical wires are passing under the bridge, and I think it's fair to assume that trains will be lower by them.

rev
SA MVP (Most Valued Poster 4000+)
Posts: 6020
Joined: Sat Nov 11, 2006 12:14 pm

[U/C] Re: Ovingham Level Crossing Removal | $231m

#183 Post by rev » Wed Dec 22, 2021 7:17 pm

You guys do realise that where that truck is parked, is not the highest point of the bridge?

User avatar
ChillyPhilly
Super Size Scraper Poster!
Posts: 2582
Joined: Sun Dec 07, 2008 11:35 pm
Location: Kaurna Land.
Contact:

[U/C] Re: Ovingham Level Crossing Removal | $231m

#184 Post by ChillyPhilly » Wed Dec 22, 2021 7:19 pm

The question is about double stacked freight.
Our state, our city, our future.

All views expressed on this forum are my own.

User avatar
Norman
Donating Member
Donating Member
Posts: 6391
Joined: Sun Mar 25, 2007 1:06 pm

[U/C] Re: Ovingham Level Crossing Removal | $231m

#185 Post by Norman » Sat Dec 25, 2021 11:33 pm

I've made another drive-through video, which you can watch here: https://youtu.be/AEhWp8cjlIA

Bacon
High Rise Poster!
Posts: 117
Joined: Tue Oct 15, 2013 1:17 pm

[U/C] Re: Ovingham Level Crossing Removal | $231m

#186 Post by Bacon » Thu Dec 30, 2021 5:53 pm

ChillyPhilly wrote:
Wed Dec 22, 2021 7:19 pm
The question is about double stacked freight.
What’s the point of double stacking when it’s just going to smack into the tunnel heading up to belair?

VLtom
Sen-Rookie-Sational
Posts: 33
Joined: Fri Feb 19, 2021 6:11 pm
Location: The Adelaide O-Bahn
Contact:

[U/C] Re: Ovingham Level Crossing Removal | $231m

#187 Post by VLtom » Sat Jan 01, 2022 12:23 pm

Future proofing the ARTC DIRN is a good thing to do, increasing freight productivity with taller wagons and getting run through to Melbourne on the South Line would be a helpful, even with Inland Rail (especially things like LCL freight). Also could mean if the Regency Road bridge is rebuilt or track lowered taller carriages could be used on the Ghan, like an observation car or something akin to Amtrak's Superliners.

User avatar
ChillyPhilly
Super Size Scraper Poster!
Posts: 2582
Joined: Sun Dec 07, 2008 11:35 pm
Location: Kaurna Land.
Contact:

[U/C] [U/C] Re: [U/C] Re: Ovingham Level Crossing Removal | $231m

#188 Post by ChillyPhilly » Sat Jan 01, 2022 1:58 pm

VLtom wrote:Future proofing the ARTC DIRN is a good thing to do, increasing freight productivity with taller wagons and getting run through to Melbourne on the South Line would be a helpful, even with Inland Rail (especially things like LCL freight). Also could mean if the Regency Road bridge is rebuilt or track lowered taller carriages could be used on the Ghan, like an observation car or something akin to Amtrak's Superliners.
Agree with this, but I think there is greater value in diverting freight around the north of Adelaide to remove it from travelling through residential areas and the winding Hills. This will make freight more efficient and economical.

This can leave the existing corridor for metropolitan and passenger services, such as to Mt Barker, Murray Bridge and we'll beyond.
Our state, our city, our future.

All views expressed on this forum are my own.

User avatar
Spotto
Legendary Member!
Posts: 690
Joined: Wed May 15, 2019 9:05 pm

[U/C] Re: Ovingham Level Crossing Removal | $231m

#189 Post by Spotto » Sat Jan 01, 2022 3:19 pm

VLtom wrote:
Sat Jan 01, 2022 12:23 pm
if the Regency Road bridge is rebuilt or track lowered taller carriages could be used on the Ghan, like an observation car or something akin to Amtrak's Superliners.
Double-decker passenger carriages are a terrible idea and a logistical/accessibility nightmare. Accessibility in particular considering that a large chunk of Journey Beyond’s rail holiday clientele are older people and retirees.

It would be far easier for them to continue fully refurbishing and rebuilding the existing carriages, or (less likely) purchase something similar.

User avatar
Pistol
Legendary Member!
Posts: 1000
Joined: Sat Jul 01, 2006 5:46 pm
Location: Adelaide

[U/C] Re: Ovingham Level Crossing Removal | $231m

#190 Post by Pistol » Thu Feb 03, 2022 2:24 pm

Received an information pamphlet about this project in my mailbox.
States that the Ovingham station upgrade is now incorporated into this project.
So, without a schedule change, the station will be complete by March 2023.

They have started demolition with mounds of concrete all along the platform.
I haven't seen an image of what to expect though.
I would hope that 10m would buy something substantial - please not just new shelters and some screens.
Sticking feathers up your butt does not make you a chicken

PD2/20
High Rise Poster!
Posts: 362
Joined: Sun Feb 23, 2014 2:32 pm

[U/C] Re: Ovingham Level Crossing Removal | $231m

#191 Post by PD2/20 » Thu Feb 03, 2022 5:09 pm

Pistol wrote:
Thu Feb 03, 2022 2:24 pm
Received an information pamphlet about this project in my mailbox.
States that the Ovingham station upgrade is now incorporated into this project.
So, without a schedule change, the station will be complete by March 2023.

They have started demolition with mounds of concrete all along the platform.
I haven't seen an image of what to expect though.
I would hope that 10m would buy something substantial - please not just new shelters and some screens.
The concrete was sawn off the platform faces about two weeks ago during the level crossing closure.

I wonder whether the $10m cost includes the landscaping of the area under the bridge. Other station upgrades being undertaken are limited in scope, mainly platform resurfacing or new shelters.

User avatar
ChillyPhilly
Super Size Scraper Poster!
Posts: 2582
Joined: Sun Dec 07, 2008 11:35 pm
Location: Kaurna Land.
Contact:

[U/C] Re: Ovingham Level Crossing Removal | $231m

#192 Post by ChillyPhilly » Thu Feb 03, 2022 10:15 pm

Please keep us posted regarding a station upgrade. Virtually all stops along the line are in need of substantial rebuilding.
Our state, our city, our future.

All views expressed on this forum are my own.

I Follow PAFC
High Rise Poster!
Posts: 420
Joined: Tue Jul 08, 2014 7:23 pm

[U/C] Re: Ovingham Level Crossing Removal | $231m

#193 Post by I Follow PAFC » Wed Feb 09, 2022 11:17 am

The recent switching of traffic onto new lanes on Churchill Road was a major milestone for the Ovingham Level Crossing Removal Project as the new Torrens Road bridge takes shape.
Once complete, the project will create a faster, safer and more efficient junction for pedestrians, motorists and cyclists - eliminating one of Adelaide’s most frustrating bottle necks.
Thank you for your patience while this important work continues.
The project is expected to be complete in 2023, weather permitting.
To find out more or receive updates directly to your inbox, visit dit.sa.gov.au/ovingham
https://www.facebook.com/DFITSA/videos/ ... 471302457/
I Follow The Port Adelaide Football Club
https://www.facebook.com/IFollowThePAFC/

User avatar
PeFe
Super Size Scraper Poster!
Posts: 1624
Joined: Mon Dec 07, 2009 9:47 am

[U/C] Re: Ovingham Level Crossing Removal | $231m

#194 Post by PeFe » Thu Apr 07, 2022 6:57 pm

Some good ground shots in this video of the Ovingham level crossing upgrade

https://youtu.be/UE1s4aulucY?t=5

Nort
Super Size Scraper Poster!
Posts: 2153
Joined: Tue Feb 09, 2010 2:08 pm

[U/C] Re: Ovingham Level Crossing Removal | $231m

#195 Post by Nort » Fri Apr 08, 2022 9:06 am

No photo unfortunately since I wasn't prepared for it, but you get a great view of this on approach to Adelaide Airport if landing from the north. It makes sense, but didn't realise before now just how much the overpass curves around.

Post Reply

Who is online

Users browsing this forum: abc, Ahrefs [Bot], Google [Bot], JCK98, rubberman and 18 guests