[COM] South Road Superway | $842m | 3km

Threads relating to transport, water, etc. within the CBD and Metropolitan area.
Message
Author
User avatar
Shuz
Banned
Banned
Posts: 2538
Joined: Sat Jun 02, 2007 1:48 pm
Location: Glandore

[COM] Re: South Road Upgrade

#661 Post by Shuz » Tue Dec 02, 2008 2:00 pm

God forbid you should ever become a politician, that would be a nightmare.

I would rather suffer a shortage of workers within the construction industry than to just blatantly open the floodgates to immigration to fill up those spaces. We cannot afford to allow poorly educated Indian labourers at the helm of the Australian building industry. That would severely impair our repuation for high building safety standards and allow an en masse of short-cutting exercises to be undertaken jeopardising a buildings structure.

User avatar
AtD
VIP Member
VIP Member
Posts: 4579
Joined: Wed Jul 20, 2005 7:00 pm
Location: Sydney

[COM] Re: South Road Upgrade

#662 Post by AtD » Tue Dec 02, 2008 2:23 pm

Shuz wrote:poorly educated Indian labourers
Why would they be poorly educated? There'd be literally millions of qualified tradies in India willing to sit though the Australian equivalent qualification.

raulduke
High Rise Poster!
Posts: 174
Joined: Fri Mar 28, 2008 10:22 am

[COM] Re: South Road Upgrade

#663 Post by raulduke » Wed Dec 03, 2008 11:55 am

Builtit wrote: What a load of CRAP you dont know what you are talking about do you james. Green cards are getting fazed out into white cards and is all about safety so the workers can go home alive every night and has nothing to do with the union, The union has no power anymore so you hardly ever see them on site. What are you talking about when you say that the workers are all slack , if your slack the boss will sack you because there is no job security at all the union cant do anything. The pay is also crap why do you think there is such a skill shortage because no kids want to work hard for fuckall pay do they. So i would like to know what site you think you work at.
1. The Union does still have power - take a look at the CFMEU in WA and Victoria.

2. The pay is good in the construction industry - the hours aren't.

3. The skills shortage is due to the better rates of pay available in the mining industry (as many construction skills are portable to mining).

4. Workers are motivated by clever contractors ;).

User avatar
Norman
Donating Member
Donating Member
Posts: 6523
Joined: Sun Mar 25, 2007 1:06 pm

[COM] Re: South Road Upgrade

#664 Post by Norman » Thu Dec 04, 2008 1:52 am

The median is currently being completed on Anzac Highway. After it's done, the full 3 lanes on Anzac Highway will reopen.

The footpath on the bridge has also been completed.

frank1
Donating Member
Donating Member
Posts: 439
Joined: Mon Oct 08, 2007 4:54 pm

[COM] Re: South Road Upgrade

#665 Post by frank1 » Thu Dec 04, 2008 2:30 pm

When is the expected completion of the entire project......surely not too far off now?

User avatar
Norman
Donating Member
Donating Member
Posts: 6523
Joined: Sun Mar 25, 2007 1:06 pm

[COM] Re: South Road Upgrade

#666 Post by Norman » Thu Dec 04, 2008 2:43 pm

frank1 wrote:When is the expected completion of the entire project......surely not too far off now?
My estimates only:
Traffic returns to 6 lanes on ANZAC Highway:
End of December 2008

New traffic lights and opening of the south-western lanes:
February 2009

Official opening:
May/June 2009

Landscaping work completed:
August/September 2009

User avatar
Norman
Donating Member
Donating Member
Posts: 6523
Joined: Sun Mar 25, 2007 1:06 pm

[COM] Re: South Road Upgrade

#667 Post by Norman » Thu Dec 04, 2008 3:08 pm

Here's the full info from the Adelaide Connect website. The info is from September 2007 but should still be accurate:
TIMEFRAMES AND STAGING OF WORKS
• Construction activities started in July 2007 and are scheduled for completion by the end of 2009.
• Construction works will take place in three stages:
Stage 1: (July 2007 – Mid 2008).
Stage 2: (Mid 2008 – Mid 2009).
Stage 3: (Mid 2009 - End 2009).
In summary, Stage 1 is building the noise walls, southern bridge deck, new culverts and north-bound entry ramp. Stage 2 is the northern bridge deck, excavating the underpass and opening the underpass by the end of Stage 2. Stage 3 will be landscaping and finalising any other work.

JamesXander
High Rise Poster!
Posts: 487
Joined: Mon Oct 22, 2007 8:07 pm

[COM] Re: South Road Upgrade

#668 Post by JamesXander » Fri Dec 05, 2008 9:28 pm

muzzamo wrote:Just open the immigration floodgates for construction workers/trades.. thats what they have done in IT. Will solve any "slackness" problems.

Then that just fuels house prices and more construction as those people have to find homes etc.


Mass immigration at this point in time is the stupidest thing ever.



Yet Australia will record its largest ever intake of migrants.


Talk of 8% unemployment. Demand for skilled workers down (reported on news). It just doesnt stack up.

waz94
Gold-Member ;)
Posts: 83
Joined: Mon Dec 08, 2008 7:14 pm

[COM] Re: South Road Upgrade

#669 Post by waz94 » Mon Dec 08, 2008 7:33 pm

Hi Guys,

first time poster so apologies if wrong forum however:
- 1) Does anyone know what they are builing just north of the South Rd/ANAZC Hwy underpass. On the left hand side as you drive north near Tennyson Rd corner. It has BADGE construction sign out the front. Also when is it due to be finished?
- 2) Does anyone know when the cars will be able to use the underpass. The website states that around May but I am unsure if the construction is ahead or behind in schedule. Hoping that it maybe able to be used in MArch/April but may require some inside knowledge.
Cheers,

User avatar
Norman
Donating Member
Donating Member
Posts: 6523
Joined: Sun Mar 25, 2007 1:06 pm

[COM] Re: South Road Upgrade

#670 Post by Norman » Mon Dec 08, 2008 8:23 pm

waz94 wrote:- 1) Does anyone know what they are builing just north of the South Rd/ANAZC Hwy underpass. On the left hand side as you drive north near Tennyson Rd corner. It has BADGE construction sign out the front. Also when is it due to be finished?
It's some type of warehouse, but unsure of the nature of it.
waz94 wrote:- 2) Does anyone know when the cars will be able to use the underpass. The website states that around May but I am unsure if the construction is ahead or behind in schedule. Hoping that it maybe able to be used in MArch/April but may require some inside knowledge.
Cheers,
Apparently this project is right on schedule. The opening I predict to be sometime around April or May, most likely the latter.

User avatar
Omicron
Super Size Scraper Poster!
Posts: 2336
Joined: Mon Oct 15, 2007 2:46 pm

[COM] Re: South Road Upgrade

#671 Post by Omicron » Mon Dec 08, 2008 11:18 pm

The large warehouse-esque building by Badge on the north-west corner of the underpass site is to become the Tennyson Medical Centre, if I remember rightly.

User avatar
Xaragmata
Super Size Scraper Poster!
Posts: 1613
Joined: Thu Jul 19, 2007 2:08 pm
Location: Adelaide / West
Contact:

[COM] Re: South Road Upgrade

#672 Post by Xaragmata » Tue Dec 09, 2008 12:22 am

Omicron wrote:The large warehouse-esque building by Badge on the north-west corner of the underpass site is to become the Tennyson Medical Centre, if I remember rightly.
That is correct, and will apparently include a convenience store and coffee shop. Although, I can't google any recent
mentions of "Tennyson Medical Centre" except on here - it may open under a different name. (?)

User avatar
Omicron
Super Size Scraper Poster!
Posts: 2336
Joined: Mon Oct 15, 2007 2:46 pm

[COM] Re: South Road Upgrade

#673 Post by Omicron » Tue Dec 09, 2008 12:27 am

Xaragmata wrote:
Omicron wrote:The large warehouse-esque building by Badge on the north-west corner of the underpass site is to become the Tennyson Medical Centre, if I remember rightly.
That is correct, and will apparently include a convenience store and coffee shop. Although, I can't google any recent
mentions of "Tennyson Medical Centre" except on here - it may open under a different name. (?)
I don't recall seeing that sign out the front last time I went past, either. Perhaps there is to be a name change - I know that if I was booked in at a 'Tennyson Medical Centre' I'd be heading up Military Rd, not towards Kurralta Park.

User avatar
Xaragmata
Super Size Scraper Poster!
Posts: 1613
Joined: Thu Jul 19, 2007 2:08 pm
Location: Adelaide / West
Contact:

[COM] Re: South Road Upgrade

#674 Post by Xaragmata » Tue Dec 09, 2008 3:16 am

Omicron wrote:
Xaragmata wrote:
Omicron wrote:The large warehouse-esque building by Badge on the north-west corner of the underpass site is to become the Tennyson Medical Centre, if I remember rightly.
That is correct, and will apparently include a convenience store and coffee shop. Although, I can't google any recent
mentions of "Tennyson Medical Centre" except on here - it may open under a different name. (?)
I don't recall seeing that sign out the front last time I went past, either. Perhaps there is to be a name change - I know that if I was booked in at a 'Tennyson Medical Centre' I'd be heading up Military Rd, not towards Kurralta Park.
Looks like it's being constructed as "Specialist Medical Centre", which may not be its final name (?)

5.3 506-520 SOUTH ROAD, KURRALTA PARK (SPECIALIST MEDICAL CENTRE)

DEVELOPMENT APPLICATION DETAILS
DEVELOPMENT PROPOSAL Construction of a Specialist Medical Centre comprising
Radiotherapy, Radiology, Pathology, Oncology (Cancer
Care Centre), Gastroenterology, Day Surgery,
Pharmaceutical Laboratory, Pharmaceutical Supply,
Consulting Rooms and Reception Areas together with
Shops (including a Pharmacy) and associated Car Parking
and Landscaping.
APPLICANT Cancer Care SA Pty. Ltd

RiseHigh
High Rise Poster!
Posts: 103
Joined: Wed Apr 23, 2008 6:41 pm

[COM] Re: South Road Upgrade

#675 Post by RiseHigh » Thu Dec 11, 2008 5:14 pm

raulduke wrote:
Builtit wrote: What a load of CRAP you dont know what you are talking about do you james. Green cards are getting fazed out into white cards and is all about safety so the workers can go home alive every night and has nothing to do with the union, The union has no power anymore so you hardly ever see them on site. What are you talking about when you say that the workers are all slack , if your slack the boss will sack you because there is no job security at all the union cant do anything. The pay is also crap why do you think there is such a skill shortage because no kids want to work hard for fuckall pay do they.
1. The Union does still have power - take a look at the CFMEU in WA and Victoria.

2. The pay is good in the construction industry - the hours aren't.

3. The skills shortage is due to the better rates of pay available in the mining industry (as many construction skills are portable to mining).

4. Workers are motivated by clever contractors ;).
1. This is Adelaide and your lucky if you see the union rep ever on site, unless your on a big site with the main builders.
2. The pay is crap unless you think 50000 is good pay for a tradesman of 25 years experiance. The hours are great 7 to 3 unless you cant get out of bed.
3. They only started talking about skills shortage because the mining industry is was taking off, and ofcourse there are plenty of tradesman working away because the money is 3 times better.

Post Reply

Who is online

Users browsing this forum: Bing [Bot], Google [Bot] and 3 guests